Every mission request needs sign-off from two independent things: the Fund Holder of the budget being charged, and a structural Approval Flow based on where you sit in the organization. This guide explains the second part.
"Requesting as" — your own position
When you create a mission, the Requesting as field on the New Request form asks which of your own organizational positions you are submitting under — your Unit, Department, or Area membership or leadership. This is independent of the Charging structure (the fund you are billing the mission to): one describes who you are, the other describes whose budget pays for it.
- If you hold more than one position, a dropdown lets you pick which one you are requesting as.
- If you hold exactly one, it is shown automatically (read-only).
- If you are the General Director, this is locked — your requests always route to HR's Staff Affairs Unit/Division instead of the normal structural chain (see below).
- If you have no structural position at all (an external/non-staff requester), approvers are instead based entirely on the Charging structure.
The Approval Flow
Once submitted, the mission's detail page shows an Approval Flow timeline — an ordered list of stages, each showing:
- The approver's picture, name, and personal code.
- The role they are acting in (e.g. Department Leader, Area Manager) — using your organization's own custom labels if it has renamed these roles.
- The structure that role belongs to, shown as a full breadcrumb (e.g. Area > Department > Unit) — frozen at the moment the mission was submitted, so it always reflects the organization as it was then, even if that person later moves to a different structure or the org chart is reorganized.
Stages must be approved in order. Each approver only sees the request once every stage before theirs is done.
Why the chain can look shorter than you expect
A few things intentionally remove a stage from your chain rather than showing an approval that could never happen:
| Situation | What happens |
|---|---|
| You are the person who would normally approve that stage (e.g. you are your own Department's Leader) | That stage is skipped — you cannot approve your own request. |
| Your mission is marked zero cost | There is no Fund Holder stage at all (nothing to charge), only the structural chain based on your own Unit/Department/Area. |
| You are the General Director | The normal structural chain does not apply to you — your request routes to whichever HR Staff Affairs Unit/Division leads your organization has configured. |
| Your tenant configured that scenario with no structural roles at all | Only the Fund Holder needs to approve. |
When the fund belongs to a different part of the organization
If you charge a fund that is hosted by a completely unrelated Unit, Department, or Area — not your own, and not one of your own structure's parents or children — your tenant may have configured that structure's own chain to also weigh in, since those people have no reporting relationship to you and would otherwise never see the request. If this applies to you, the Approval Flow will show their approvers alongside (before, after, or instead of) your own, depending on how your organization set it up.
Overrides
The account Founder and the General Director can approve or reject any pending stage, even one that is not structurally theirs — the mission detail page will label this clearly as an override rather than a normal approval, and will show whose stage was actually being acted on.